In order to meet the needs of market requirements of users, we must strengthen quality management and formulate necessary rules and regulations to ensure the improvement of product quality. The quality management system includes the formulation of raw material quality standards, quality control, analysis, tracking and assessment management.
Formulation and management of quality standards
Quality control and tracking 、Workshop staff shall:
Quality analysis
Management and assessment of quality accidents
(2)Incoming inspection control of raw materials
Standard :
ASTM D1000 with test report
G / t12834-2002, with test report
GB8624-1997, with test report
Q/SH002. 07.z.234-1998, with test report
EN12068
Inspection items:
Packaging: moisture-proof and complete marks (manufacturer, trademark, certificate of conformity, name, model, batch number, net weight, moisture-proof, moisture-proof, etc.)
Sampling method: each batch shall be sampled according to 5% of the packaging units, but in small batch, the sampling quantity shall not be less than 3 packaging units.
The raw materials shall be inspected by the quality inspection department of the manufacturer. The manufacturer shall ensure that the products meet the standard requirements and provide relevant inspection certificates.
The company conducts acceptance according to the order standards and relevant national / industrial standards. If one of the inspection results does not meet the technical requirements of this standard, it shall take samples from twice the quantity of packaging units to recheck the item. If the recheck results still do not meet this standard, the batch shall be treated as unqualified.
The product quality certificate is required, otherwise it will not be accepted.
Other items shall be determined or entrusted according to the supplier's test report
The company has established a complete and documented quality inspection system to ensure that all factors affecting the safety, reliability, adaptability of on-site installation and operation and long-term service performance of products have been considered, and all factors of test, identification and inspection have been considered in the implementation of the system.
Maintain the traceability of inspection records. Each production post has established a set of conventional production records and documented quality inspection system to ensure that all factors affecting product safety, reliability, on-site installation and operation adaptability and long-term service performance are considered in the production records. After the products are delivered and shipped, the records shall be kept for 3 years for use by the owner during acceptance and various inspections.
The surface of the heat shrinkable tape is covered with suitable wrapping paper that is easy to move and prevents dust. The manufacturer's name, code and manufacturing date shall be clearly marked on each outer package. Packaging and transportation shall be suitable for sea, railway and road transportation in accordance with relevant standards and specifications and the provisions of transportation packaging.
One set of small package shall be used for weld joint repair of primer. The deviation of paint film thickness in the normal coating process on site shall be fully considered, and the amount shall be sufficient in combination with the reserved length of the end of anti-corrosion pipe. Each set of quantity shall ensure that the minimum paint film thickness within the coating range (at the bare steel of joint repair) meets the design requirements, and the mixing and coating tools shall be attached; The adhesive layer of each heat shrinkable tape shall be isolated with anti sticking materials and then packed with plastic film. A certain number of heat shrinkable tapes shall be packed in cartons. The product manual, production certificate and other relevant documents shall be attached to the box.
Each roll of patch is lined with anti sticking materials and plastic outer packaging bags, and then packed in cartons.
All products shall be kept clean, dry and intact during packing, transportation and storage until installation; Proper measures shall be taken for protection to prevent damage or pollution of hot melt adhesive and primer during transportation.
According to the characteristics of the product, the packaging shall meet the transportation requirements, be responsible for transportation to the delivery place specified in the contract, and select the route with low transportation risk, low cost and short distance. The packaging shall meet the transportation loading and unloading requirements and ensure safe and nondestructive transportation to the receiving place.
Shipping notice: our company will notify the tenderee of the contract number, name of goods, quantity, gross weight, volume (cubic meter), name of means of transport and date of departure by telegram or fax within 24 hours after the goods are shipped.
The packaging is carried out in accordance with national standards or professional standards. The corrosion, damage and loss of goods caused by poor packaging shall be borne by our company.